Dug well positioning folk common sense
[Abstract]:
1, cracks in the rock roof, more than halfway up the waist
2, rock formation as the table, water is not too much
3, rock slope slope, slope water more
4, cistern rock water storage, water-rich easy to find
5, soft and hard phase, water is not difficult
6, two mountain folder a ditch, ditch water
7, plus a ditch two mountains, ditch water
8, a single lithological rock changes, low-lying formations can be wells
9, limestone class is cut, fissure water flow is blocked
10, half a circle of landslide, water in it
11, fault broken zone, easy to mine water
12, the mountain turned, there is a big flow
13, weathered layer is covered, the middle of easy water mining
14, rock fold like waves turn, squeeze often broken spring
15, looking for karst limestone, far away from a good well
16, a sudden slow rock dip, cracks find water is not difficult